A transport minister told MPs on 11 November the government would clear its own obstacles from the Hounslow to Hendon line. TfL's consultation closed 18 November.
Overview
Updated 19 November: TfL’s consultation closed at midnight on 18 November. TfL aims to publish its consultation report in early 2027 (TfL’s consultation page).
The government will make sure there are “no Government-controlled obstacles” in the way of the West London Orbital if Transport for London decides to go ahead with it, the transport minister Justin Madders told MPs on Wednesday 11 November. The pledge came at the end of a 30-minute Westminster Hall debate led by Ruth Cadbury, the Labour MP for Brentford and Isleworth.
The level crossings on the Chiswick side of the line came up too. TfL’s public consultation on the route closed on Wednesday 18 November.
The Orbital is the London Overground line TfL has proposed between Hounslow and Hendon. It would run mostly on existing tracks, including the freight line through Chiswick, with a new station at Lionel Road by Brentford’s stadium. Our September guide to the route explains where it would and would not stop.
What the minister said
Mr Madders, the Parliamentary Under-Secretary of State for Transport, said transport in the capital is devolved, so the decision on whether to build the line belongs to the Mayor and TfL. On the timetable he told MPs, according to the official Hansard record:
“Of course, it is for Transport for London to determine the timetable for the scheme and keep it on track for possible operation by the mid-2030s. Should Transport for London choose to progress it, we will of course work with them to ensure that there are no Government-controlled obstacles in their way.”
He said the government would also work with Network Rail and TfL “on resolving issues, including on capacity, given that passengers and freight services would share the line”.
On money, he said the scheme “is not yet at a funding package stage”. The Chancellor committed in the Budget to legislating so the Mayor can set up a successor to the Elizabeth line business rate supplement, and the minister said mechanisms like that “will help the Greater London Authority to finance future transport infrastructure projects such as west London orbital”. Full details of the fiscal devolution plans are due at the spending review in 2027.
He added that the Rail Minister, Lord Hendy, regularly meets TfL and the Greater London Authority and would be happy to meet them again about the scheme.
The Chiswick question: level crossings
The neighbouring MP, Dr Rupa Huq of Ealing Central and Acton, raised the crossings twice. Early in the debate she asked Ms Cadbury:
“Does she agree that we need a comprehensive traffic survey? Obviously, the benefits are great, it will be very quick to go to Brent Cross, for example, but several level crossings in Chiswick, which we used to share, will be down permanently, so where will that traffic go? Will it evaporate?”
Ms Cadbury replied that “there is clearly a lot of work to be done, particularly on alternatives to the level crossings”, and said she was sure the councils and TfL “will work together to find effective solutions that do not disbenefit local areas in ways that can be avoided”.
Later Dr Huq told the minister what she had heard on the doorstep about South Acton station in W4: “People were saying that unless we sort out the level-crossing issue and find a better way of doing them, communities will be cut in half and there will be permanent gridlock. They were also saying that this project will never happen, because the money is not there.”
Mr Madders answered that the government would give the Mayor “the powers and tools to make the project happen”, and that it would then be for him to decide. On the crossings, he said: “There is a consultation at the moment, which I hope will be able to identify and deal with some of the particular issues that she mentioned.”
The crossings in question are on Bollo Lane. TfL’s consultation says the barriers there are already down for 40 to 50 per cent of the day and would be down for up to 75 per cent of the time with Orbital trains added, so at least one of the two crossings would probably have to close to traffic. TfL’s stated preference is to close the Richmond line crossing, partly to keep access to Chiswick Business Park and the 440 and 70 bus routes. The full detail is in our guide to the route.
What Ruth Cadbury said
Ms Cadbury, who secured the debate, set out the route from Hounslow through Isleworth, Syon Lane and Brentford, the new station at Lionel Road, then Acton and Old Oak Common for HS2 and the Elizabeth line, and on to Harlesden, Neasden, Brent Cross and Hendon.
“It is projected that, for west and north-west London, the scheme will help to deliver 25,000 new homes and 11,500 new jobs, and will bring more than 3 million jobs within a 45-minute commute,” she told MPs. She said some 200 businesses had recently confirmed they back the project.
She called the line “more or less a shovel-ready scheme”, because it uses rail lines that already have capacity, “with some parts currently used only by freight, such as the Dudding Hill line and the stretch between South Acton and Kew Bridge”. Only four new stations would be needed and no tunnelling.
She also told MPs that constituents in Whitton had asked whether the line could carry on beyond Hounslow, round the Hounslow loop to Whitton and Twickenham, after the Sutton and Cheam MP, Luke Taylor, said TfL had refused to extend it to those areas. She said she hoped South Western Railway and TfL could look at what extra services would help.
She said the next stage of design has been commissioned and will be worked on throughout 2027, and asked the minister whether the government would meet TfL, the West London Alliance of councils, local MPs and other partners to help bring the scheme forward.
In a statement after the debate, she said:
“The West London Orbital would be a game-changer for my constituents and for West London. It would reduce journey times, add extra capacity to our transport network and bring economic growth and investment across West London. The scheme largely uses existing unused freight lines, which means the line can be introduced quickly and doesn’t require the same levels of spending as other rail projects.
“While we are fortunate to have good public transport here in West London, it could be better. The WLO would mean quicker and easier journeys such as to Wembley, Brent Cross and to get on the Elizabeth line. That’s why I strongly support building the WLO. It’s good for connectivity, and also good for businesses and good for West London.
“I was pleased to hear the positive comments from the Transport Minister, Justin Madders, including the commitment that Ministers will ensure that there are no Government-shaped obstacles in the way of this project.”
Her office says the line is backed by a coalition of more than 200 businesses, the four major local authorities in west London including Hounslow Council, and the Mayor of London.
What it means for you
Nothing has been decided. The debate was a motion that the House “has considered” government support for the line, and it was agreed without a vote on the scheme itself. Whether it is built is for the Mayor and TfL, and there is no funding package yet.
The consultation was the place to have a say on the crossings. Both Dr Huq and the minister pointed to it. It closed on Wednesday 18 November 2026, and TfL aims to publish its report on the responses in early 2027 on TfL’s Have Your Say page.
If you cross Bollo Lane by car, bike or on foot, the level crossing questions in that consultation are the part most likely to change a Chiswick journey, so the report is the next thing to watch.
Sources
- Hansard, West London Orbital Rail Project, Westminster Hall, 11 November 2026, read 13 November 2026, for every quotation from the debate, the route described by Ruth Cadbury, the Whitton exchange, the 2027 design stage, the minister’s comments on funding, Lord Hendy and the mid-2030s timetable.
- Media release from the office of Ruth Cadbury MP, 12 November 2026, for her statement after the debate and the list of backers.
- Transport for London, West London Orbital consultation, for the closing date, the Bollo Lane barrier figures and the preferred crossing closure, as set out in our September guide.
Thanks to the office of Ruth Cadbury MP for sending us the release.
Have your say